When logging into the CommuteSmart website to log my carpool commutes, there was a notice for an Open House to discuss the possible alternatives for transit service along U.S. 280. The open house will take place Wed., Nov. 9, 2011, from 3-7pm, at the Marriott Hotel, 3590 Grandview Parkway, Birmingham, AL.
Although I am a resident of Hoover, AL, I avoid Highway 280 as much as humanly possible. The congestion is legendary. You'll find the traffic bad even outside the typical rush hour times. However, I realize there are many people who use the highway out of necessity. I'm very interested to see if we (Alabama) can solve this problem the right way, the first time.
The problem
![]() |
| "280" by Wally Argus |
The toll bridge
![]() |
| Elevated toll bridge as proposed by Figg |
![]() |
| Elevated toll bridge as proposed by Figg |
![]() |
| Elevated toll bridge as proposed by Figg |
A better alternative
![]() |
| Interchange in ReThink280 plan |
I think the ReThink280 proposal offers a few benefits over the elevated toll bridge plan:
- Cost reduction in both upfront construction and long term maintenance.
- 4 end-to-end express lanes, without traffic lights, turning movements or tolls from downtown to Eagle Point.
- 2 (or more) local lanes added, controlled by traffic signals and connecting to all existing cross streets.
- Ground-level grade separations (compact local interchanges and high-capacity split diamond interchanges, with the express lanes travelling under the interchanges).
- Use of existing properties.
- No worries of sink holes collapsing the bridge.
![]() |
| Sinkhole in Tampa [credit: Skip O'Rourke] |
There are two problems not addressed by either the ALDOT plan or the ReThink280 plan:
- The connection from 280 to downtown Birmingham via the Red Mountain Expressway is a current bottleneck. If even more traffic were enabled along 280, that bottleneck will grind to a halt. What is the answer? A wider (ironically, elevated) highway (280/31/Red Mountain Express/Elton B. Stephens Expressway) from Red Mountain to I-20/59 (even though there's a proposal to replace the elevated interstate through downtown with one on the ground)? Better interchanges at the exit ramps?
- Birmingham needs mass public transit in some form, whether it be bus, light rail, etc., for future growth and public movement.
The U.S. 280 Corridor Transit Study was scheduled to be completed in October 2011 and will analyze 1) the enhancement of local bus service 2) premium bus service with queue jump lanes 3) premium bus service with 2 managed lanes in each direction & 4) bus rapid transit.
This open house is for public discussion of the study that has been completed.
This open house is for public discussion of the study that has been completed.
If you live and/or work near the metro Birmingham area, or you just want to learn about the transit alternatives and/or give feedback, I recommend going to the meeting on Wednesday.
When searching for more information on the open house, I couldn't find anything at the transit study's website, any of the city websites, the RPCGB, BBA, or CommuteSmart websites.
[Update, 11/7] The agenda states that a presentation will be given 15 minutes past the hour (i.e. 3:15, 4:15, 5:15, & 6:15) with time for questions & comments by attendees after each presentation. This was designed to be as flexible as possible to allow people to go and learn about the project and provide feedback.
Here is the notice once logged into CommuteSmart:
JOIN US!
US 280 Corridor Transit Study
The Regional Planning Commission of Greater Birmingham invites you to an Open House to discuss the possible alternatives for transit service along U.S. 280 from I-20/I-59 in Downtown Birmingham to the Shelby/Talladega County Line. The Open House will allow people to come and learn about the progress of the transit study, give their comments, and participate in opinion surveys about transit alternatives and the potential funding sources for constructing and operating the service. Information displays, opinion surveys, and opportunities for public comment will be featured.
When:
Wed. November 9, 2011
Times:
3 pm to 7 pm
Site:
Marriott Hotel
3590 Grandview Parkway
Birmingham, Alabama
Footnotes:
[1] Progress 280 whitepaper (2006-11-10 version) Progress 280 whitepaper (2006-11-17)
[2] http://www.figgbridge.com/focus_on_bridges.html
[3] http://www.rpcgb.org/download/mpo/RPCGB-MPO-RTP-Chapter-4-Needs-Analysis-wo-appendixpdf.pdf (page 4-87)
[4] http://www.invernesshomeowners.org/clientuploads/documents/280_meet_0806.pdf
[5] http://elevatedhighway.blogspot.com/p/rethink280-plan.html (as presented to the Hoover City Council in 2010)